Morgan, OH interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 6 with terminal status (shown greyed).
0active projects
0active MW
6total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AI1-121 | North Muskingum 69 KV | 69 | 90 | Battery | Withdrawn |
| AG2-355 | North Muskingum River - Philo 138 kV | 138 | 82.4 | Hybrid | Withdrawn |
| AG2-018 | Not reported | n/r | 73.5 | Solar | Withdrawn |
| AH2-283 | Not reported | n/r | 50 | Battery | Withdrawn |
| Z2-035 | Clean River Power MR-5 (Malta) | n/r | 4 | Hydro | Withdrawn |
| Z2-036 | Clean River Power MR-6 (Rokeby) | n/r | 4 | Hydro | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.