Montgomery, VA interconnection queue

1 active project totalling 32 MW in the PJM queue, plus 4 with terminal status (shown greyed).

1active projects
32active MW
5total filed
Queue IDProjectkVMWResourceStatus
AE2-280 Claytor Lake-Edgemont 138 kV 138 76 Solar Withdrawn
AG2-604 Edgemont 138 kV 138 63 Hybrid Withdrawn
AG2-518 Tech Drive 138 kV 138 32 Battery Active
AI2-145 Claytor Lake - Edgemont 138 kV 138 30.4 Solar Withdrawn
W3-010 Hans Meadow 12.47KV 12.5 0 Gas Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.