McLean, KY interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AG1-405 | Sunflower Prairie | 69 | 34.2 | Solar | Withdrawn |
| AG1-406 | Sunflower Prairie | 69 | 22 | Battery | Withdrawn |
| AI2-371 | Walnut Grove - Asahi Tap 69 kV | 69 | 17.8 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.