Substation Scout

Marion, WV interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 4 with terminal status (shown greyed).

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatus
Z1-048 Rivesville n/r 464 Gas Withdrawn
AI1-192 Price Hill - Pruntytown 138 kV 138 40 Gas Withdrawn
V3-064 Rivesville-Pruntytown 138kV 138 28 Other Withdrawn
AH2-039 Chesapeake - Paw Paw 23 kV 23 2.7 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.