0 active projects
totaling 0 MW in the PJM queue, plus 3 with terminal status (shown grayed).
0active projects
0active MW
3total filed
Queue ID
Project
kV
MW
Resource
Status
AH1-639
Lordstown - Mansfield 345 kV
345
150
Hybrid
Withdrawn
AG2-591
Bluebell-Sancap Tap 69 kV
69
36.6
Solar
Withdrawn
W4-001A_AT9
Carbon Limestone Landfil Gas to Electricity Facility
69
3.2
Gas
Deactivated
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with PJM before relying on these figures.