Substation Scout

Magoffin, KY interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AH1-455 Middle Creek 69 kV 69 39.8 Solar Withdrawn
AG1-077 Allegheny Tunnel 23 kV 23 0 Hybrid Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.