0 active projects
totaling 0 MW in the PJM queue, plus 3 with terminal status (shown grayed).
0active projects
0active MW
3total filed
Queue ID
Project
kV
MW
Resource
Status
AG2-682
Stinnett 161 kV
161
90
Solar
Withdrawn
AH1-414
Leslie - Pineville 161 kV
161
80
Hybrid
Withdrawn
AD2-105
Leslie-Stinnett 161KV
161
40.6
Solar
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with PJM before relying on these figures.