Leslie, KY interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
AG2-682 Stinnett 161 kV 161 90 Solar Withdrawn
AH1-414 Leslie - Pineville 161 kV 161 80 Hybrid Withdrawn
AD2-105 Leslie-Stinnett 161KV 161 40.6 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.