Substation Scout

Lehigh, PA interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AF2-281 LH-Decatur 13.2 0 Hybrid Withdrawn
AG1-157 Macungie-Emmaus Tie 69 kV 69 0 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.