Knott, KY interconnection queue

1 active project totalling 126 MW in the PJM queue, plus 2 with terminal status (shown greyed).

1active projects
126active MW
3total filed
Queue IDProjectkVMWResourceStatus
S56 Beaver Creek-Hazard 138kV 138 535 Coal Withdrawn
AG2-184 Harbert Metering 138 kV 138 126 Solar Active
AG2-678 Vicco - Beckham 138 kV 138 72 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.