Substation Scout

isle of wight, VA interconnection queue

1 active project totalling 100 MW in the PJM queue.

1active projects
100active MW
1total filed
Queue IDProjectkVMWResourceStatus
C01-2008 Chuckatuk 230 kV 230 100 Battery Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.