Substation Scout

isle of wight, VA interconnection queue

1 active project totalling 100 MW in the PJM queue.

1active projects
100active MW
1total filed
Queue IDProjectkVMWResourceStatus
C01-2008 Chuckatuk 230 kV 230 100 Battery Active

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.