Substation Scout

Howard, IN interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 6 with terminal status (shown greyed).

0active projects
0active MW
6total filed
Queue IDProjectkVMWResourceStatus
AG2-083 Greentown 138 kV 138 180 Solar Withdrawn
AH1-653 Greentown 138 kV 138 120 Solar Withdrawn
AH1-477 Greentown 138 kV 138 112 Battery Withdrawn
AF2-189 Greentown 138 kV 138 90 Solar Withdrawn
AI2-259 Greentown 138 kV 138 48 Solar Withdrawn
AG2-084 Greentown 138 kV 138 40 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.