Hart, KY interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
AG1-472 Seymour-Cave City 69 kV 69 48 Solar Withdrawn
AF2-365 Hart Solar 69 30 Solar Withdrawn
AI2-404 Munfordville KU Tap-Horse Cave Jct. 69 kV 69 12 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.