Substation Scout

Harrison, WV interconnection queue

4 active projects totalling 635 MW in the PJM queue, plus 3 with terminal status (shown greyed).

4active projects
635active MW
7total filed
Queue IDProjectkVMWResourceStatus
AA2-119 Glen Falls Facility 138 550 Gas Under Construction
G06_W45 Harrison 500 kV 500 500 Gas Withdrawn
I02_W73 Harrison 1, 2, 3 500 35 Coal In Service
AC1-055 Glen Falls Facility 138 30 Gas Under Construction
AD2-192 Glen Falls Facility 138 20 Gas Under Construction
Y1-034 Purdys Run Plant 23 6 Gas Withdrawn
Y1-013 McAlpin 12kV 12 4.8 Gas Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.