Substation Scout

Greenup, KY interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
U2-080 South Portsmouth 138kV 138 134 Coal Withdrawn
X4-025 Millbrook Park 138kV 138 80 Coal Withdrawn
W2-063 Millbrook Park 138kV 138 70 Hydro Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.