Greene, TN interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 1 with terminal status (shown greyed).

0active projects
0active MW
1total filed
Queue IDProjectkVMWResourceStatus
AH1-534 Sullivan Gardens - Walters 138 kV 138 13.6 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.