Giles, VA interconnection queue
2 active projects totalling 109.4 MW in the PJM queue, plus 3 with terminal status (shown greyed).
2active projects
109.4active MW
5total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AH1-145 | Peter's Mountain 138 kV | 138 | 80 | Battery | Active |
| AH1-144 | Peter's Mountain 138 kV | 138 | 29.4 | Solar | Active |
| U2-051 | Glen Lyn-Wythe 138kV | 138 | 10.4 | Wind | Withdrawn |
| AH1-383 | Celanese 138 kV | 138 | 9 | Solar | Withdrawn |
| AA1-128 | Glen Lyn | n/r | 0 | Battery | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.