Forest, PA interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| U1-078 | Tionesta Dam | n/r | 8 | Hydro | Withdrawn |
| AH1-501 | Tionesta Junction – Crown 34.5 kV | 34.5 | 6.5 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.