Essex, VA interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 4 with terminal status (shown greyed).

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatus
AG1-282 EX-Tidewater LLC 34.5 12 Solar Withdrawn
AG1-388 Ex-Umphlette LLC 34.5 12 Solar Withdrawn
AG2-001 St. Johns DP 115 kV 115 12 Solar Withdrawn
AH2-136 Dunnsville 345 kV 345 12 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.