Decatur, IN interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
AG2-331 Jefferson-Greentown 765 kV 765 156 Battery Withdrawn
AG2-219 Jefferson-Greentown 765 kV 765 42.9 Solar Withdrawn
AG2-164 Jefferson-Greentown 765 kV 765 35.1 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.