Cuyahoga, OH interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
AH1-555 Maxwell 138 kV 138 100 Battery Withdrawn
AH1-748 Not reported n/r 3.2 Other Withdrawn
C01-1005 Northfield 36 kV 36 2.9 Gas Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.