Campbell, KY interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 1 with terminal status (shown greyed).
0active projects
0active MW
1total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AC2-114 | Magnolia-Summersville 69kV | 69 | 18.9 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.