Substation Scout

Cabell, WV interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 1 with terminal status (shown grayed).

0active projects
0active MW
1total filed
Queue IDProjectkVMWResourceStatus
AB1-055 Balls Gap Battery Facility 34.5 0 Battery Deactivated

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first