Boyle, KY interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 4 with terminal status (shown greyed).

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatus
AG1-352 Hunt Farm Junction 69 kV 69 30 Solar Withdrawn
AF1-219 Hunt Farm 69 kV 69 20.4 Hybrid Withdrawn
AF2-419 Hunt Farm-Ballard 69 kV 69 12 Solar Withdrawn
AF2-420 Hunt Farm-Ballard 69 kV 69 12 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.