0 active projects
totaling 0 MW in the PJM queue, plus 3 with terminal status (shown grayed).
0active projects
0active MW
3total filed
Queue ID
Project
kV
MW
Resource
Status
AG2-153
Headquarters-Sideview 69 kV
69
45
Solar
Withdrawn
AH1-156
Cane Ridge 69 kV
69
25.4
Solar
Withdrawn
AH1-529
Renaker - Avon 138 kV
138
14.4
Solar
Withdrawn
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with PJM before relying on these figures.