Bourbon, KY interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
AG2-153 Headquarters-Sideview 69 kV 69 45 Solar Withdrawn
AH1-156 Cane Ridge 69 kV 69 25.4 Solar Withdrawn
AH1-529 Renaker - Avon 138 kV 138 14.4 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.