Bland, VA interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 1 with terminal status (shown greyed).

0active projects
0active MW
1total filed
Queue IDProjectkVMWResourceStatus
U2-052 S. Bluefield-Wythe 69kV 69 10.4 Wind Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.