Athens, OH interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 4 with terminal status (shown greyed).

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatus
AC2-039 Poston-Dexter 69kV 69 29.4 Solar Withdrawn
AC2-038 Lee 69kV 69 12 Solar Withdrawn
AC2-045 Solar Power and Light, LLC 12 3.8 Solar Withdrawn
AB1-032 Lee Station Southwest 12kV 12 1.2 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.