Substation Scout

Adair, KY interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
AI1-079 Summer Shade - West Columbia 69 kV 69 64.8 Hybrid Withdrawn
AG2-179 Sewellton Junction 69 kV 69 57 Hybrid Withdrawn
AG2-160 Not reported n/r 20 Hybrid Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.