Substation Scout

Cato 138/ (facilities above ) substation interconnection queue

1 active project totaling 130 MW in the MISO queue, plus 1 with terminal status (shown grayed).

2 MISO queue filings name Cato 138/ (facilities above ) as the point of interconnection, all in Pike County, IN.

1active projects
130active MW
2total filed
Queue IDProjectkVMWResourceStatus
J3327 Not reported 69 130 Battery Withdrawn
S1112 Not reported 69 130 Battery Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.