Substation Scout

Calamus East substation interconnection queue

2 active projects totaling 450 MW in the MISO queue.

2 MISO queue filings name Calamus East as the point of interconnection, all in Clinton County, IA.

2active projects
450active MW
2total filed
Queue IDProjectkVMWResourceStatus
J2272 Not reported n/r 250 Hybrid Active
S1107 Surplus; J1190 n/r 200 Battery Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first