Substation Scout

Surplus; EAI.AECCO SWCT1

MISO queue ID S1105

Surplus; EAI.AECCO SWCT1 (S1105) was listed in the MISO interconnection queue at the end of 2025 as a 300 MW hybrid project in Lonoke County, AR, according to Berkeley Lab’s queue data file. The filing names KEO EHV as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of March 1, 2028.

Queue IDS1105
Project nameSurplus; EAI.AECCO SWCT1
Status (as published)Active
SubstationKEO EHV
Point of interconnectionKEO EHV
CountyLonoke
StateAR
VoltageNot reported
Capacity300 MW
Resource (as published)Other+Battery
Resource categoryHybrid (normalized for filtering)
Proposed online date2028-03-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

KEO EHV substation: 2 requests in the MISO queue, 2 active totaling 600 MW.

Queue IDProjectMWResourceStatus
J1710Not reported300SolarActive

Lonoke, AR: 24 requests in the MISO queue, 6 active totaling 1,387.5 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityENTERGY ARKANSAS
Project typeGeneration
Queue date2025-06-24
Components (hybrid)Other 300 MW + Battery

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first