Surplus; EAI.AECCO SWCT1 (S1105) was listed in the MISO interconnection queue at the end of 2025 as a 300 MW hybrid project in Lonoke County, AR, according to Berkeley Lab’s queue data file. The filing names KEO EHV as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of March 1, 2028.
| Queue ID | S1105 |
|---|---|
| Project name | Surplus; EAI.AECCO SWCT1 |
| Status (as published) | Active |
| Substation | KEO EHV |
| Point of interconnection | KEO EHV |
| County | Lonoke |
| State | AR |
| Voltage | Not reported |
| Capacity | 300 MW |
| Resource (as published) | Other+Battery |
| Resource category | Hybrid (normalized for filtering) |
| Proposed online date | 2028-03-01 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
KEO EHV substation: 2 requests in the MISO queue, 2 active totaling 600 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| J1710 | Not reported | 300 | Solar | Active |
Lonoke, AR: 24 requests in the MISO queue, 6 active totaling 1,387.5 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | ENTERGY ARKANSAS |
|---|---|
| Project type | Generation |
| Queue date | 2025-06-24 |
| Components (hybrid) | Other 300 MW + Battery |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.