Substation Scout

KEO EHV substation interconnection queue

2 active projects totaling 600 MW in the MISO queue.

2 MISO queue filings name KEO EHV as the point of interconnection, all in AR.

2active projects
600active MW
2total filed
Queue IDProjectkVMWResourceStatus
J1710 Not reported n/r 300 Solar Active
S1105 Surplus; EAI.AECCO SWCT1 n/r 300 Hybrid Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first