Lonoke, AR interconnection queue

6 active projects totaling 1,387.5 MW in the MISO queue, plus 18 with terminal status (shown grayed).

6active projects
1,387.5active MW
24total filed
Queue IDProjectkVMWResourceStatus
J1097 Not reported 500 500 Solar Withdrawn
J3597 Not reported 500 348 Wind Active
J3982 Not reported 500 319.5 Wind Active
J3583 Not reported 500 300 Hybrid Withdrawn
J3747 Not reported 500 300 Hybrid Withdrawn
S1105 Surplus; EAI.AECCO SWCT1 n/r 300 Hybrid Active
J1415 Not reported 500 250 Solar Active
J1991 Not reported 500 200 Solar Withdrawn
J2909 Not reported 115 200 Solar Withdrawn
J2007 Not reported 500 150 Battery Withdrawn
J2328 Not reported 500 150 Solar Withdrawn
J2859 Not reported 115 125 Solar Withdrawn
J3109 Not reported 115 120 Hybrid Active
J1992 Not reported 500 110 Battery Withdrawn
J3036 Not reported 115 105 Solar Withdrawn
J386 Not reported 115 103 Solar Withdrawn
J1722 Not reported 115 100 Solar Withdrawn
J2126 Not reported 115 100 Hybrid Withdrawn
J622 Not reported 115 100 Solar Withdrawn
J822 Not reported 115 100 Solar Withdrawn
J378 Not reported 115 79.1 Solar Withdrawn
J1258 Not reported 500 50 Solar Active
J690 Not reported n/r 42 Solar Withdrawn
J895 Not reported 115 33 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.