Surplus; J1588 (S1079) was listed in the MISO interconnection queue at the end of 2025 as a 200 MW battery project in Cass County, ND, according to Berkeley Lab’s queue data file. The filing names BISON as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of July 30, 2028.

Queue IDS1079
Project nameSurplus; J1588
Status (as published)Active
SubstationBISON
Point of interconnectionBISON
CountyCass
StateND
VoltageNot reported
Capacity200 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online date2028-07-30
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

BISON substation: 3 requests in the MISO queue, 3 active totaling 879 MW.

Queue IDProjectMWResourceStatus
J3163Not reported479OtherActive
J1588Not reported200SolarActive

Cass, ND: 23 requests in the MISO queue, 8 active totaling 2,281 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityNORTHERN STATES POWER COMPANY
Project typeGeneration
Queue date2025-03-25

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first