Cass, ND interconnection queue
8 active projects totaling 2,281 MW in the MISO queue, plus 15 with terminal status (shown grayed).
8active projects
2,281active MW
23total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| J4105 | Not reported | 345 | 500 | Hybrid | Active |
| J4106 | Not reported | 345 | 500 | Hybrid | Active |
| J494 | Not reported | 345 | 484 | Gas | Withdrawn |
| J3163 | Not reported | n/r | 479 | Other | Active |
| J1613 | Not reported | 345 | 400 | Wind | Withdrawn |
| J1109 | Not reported | 345 | 207 | Wind | Withdrawn |
| J1170 | Not reported | 345 | 200 | Solar | Withdrawn |
| J1428 | Not reported | 345 | 200 | Solar | Withdrawn |
| J1540 | Not reported | 345 | 200 | Solar | Withdrawn |
| J1588 | Not reported | n/r | 200 | Solar | Active |
| J1852 | Not reported | 345 | 200 | Solar | Withdrawn |
| J3522 | Not reported | n/r | 200 | Solar | Active |
| J3833 | Not reported | 115 | 200 | Wind | Active |
| J743 | Not reported | 345 | 200 | Wind | Withdrawn |
| J946 | Not reported | 345 | 200 | Solar | Withdrawn |
| S1079 | Surplus; J1588 | n/r | 200 | Battery | Active |
| J1961 | Not reported | 115 | 190 | Wind | Withdrawn |
| J975 | Not reported | 115 | 150 | Wind | Withdrawn |
| J736 | Not reported | n/r | 100 | Solar | Withdrawn |
| J737 | Not reported | n/r | 100 | Solar | Withdrawn |
| J816 | Not reported | 115 | 60 | Solar | Withdrawn |
| G696 | Not reported | 115 | 50 | Wind | Withdrawn |
| G067 | Not reported | n/r | 2 | Other | Operational |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.