Cass, ND interconnection queue

8 active projects totaling 2,281 MW in the MISO queue, plus 15 with terminal status (shown grayed).

8active projects
2,281active MW
23total filed
Queue IDProjectkVMWResourceStatus
J4105 Not reported 345 500 Hybrid Active
J4106 Not reported 345 500 Hybrid Active
J494 Not reported 345 484 Gas Withdrawn
J3163 Not reported n/r 479 Other Active
J1613 Not reported 345 400 Wind Withdrawn
J1109 Not reported 345 207 Wind Withdrawn
J1170 Not reported 345 200 Solar Withdrawn
J1428 Not reported 345 200 Solar Withdrawn
J1540 Not reported 345 200 Solar Withdrawn
J1588 Not reported n/r 200 Solar Active
J1852 Not reported 345 200 Solar Withdrawn
J3522 Not reported n/r 200 Solar Active
J3833 Not reported 115 200 Wind Active
J743 Not reported 345 200 Wind Withdrawn
J946 Not reported 345 200 Solar Withdrawn
S1079 Surplus; J1588 n/r 200 Battery Active
J1961 Not reported 115 190 Wind Withdrawn
J975 Not reported 115 150 Wind Withdrawn
J736 Not reported n/r 100 Solar Withdrawn
J737 Not reported n/r 100 Solar Withdrawn
J816 Not reported 115 60 Solar Withdrawn
G696 Not reported 115 50 Wind Withdrawn
G067 Not reported n/r 2 Other Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first