Surplus; Glacier Moraine
MISO queue ID S1057
Surplus; Glacier Moraine (S1057) was listed in the MISO interconnection queue at the end of 2025 as a 360 MW hybrid project in Cumberland County, IL, according to Berkeley Lab’s queue data file. The filing names Neoga South as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of July 11, 2027.
| Queue ID | S1057 |
|---|---|
| Project name | Surplus; Glacier Moraine |
| Status (as published) | Active |
| Substation | Neoga South |
| Point of interconnection | Neoga South |
| County | Cumberland |
| State | IL |
| Voltage | Not reported |
| Capacity | 360 MW |
| Resource (as published) | Solar+Other |
| Resource category | Hybrid (normalized for filtering) |
| Proposed online date | 2027-07-11 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Neoga South substation: 2 requests in the MISO queue, 2 active totaling 510 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| S1052 | Surplus; Shelby | 150 | Hybrid | Active |
Cumberland, IL: 9 requests in the MISO queue, 4 active totaling 909.5 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | AMEREN ILLINOIS |
|---|---|
| Project type | Generation |
| Queue date | 2024-07-15 |
| Components (hybrid) | Solar 360 MW + Other |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.