Surplus; Glacier Moraine

MISO queue ID S1057

Surplus; Glacier Moraine (S1057) was listed in the MISO interconnection queue at the end of 2025 as a 360 MW hybrid project in Cumberland County, IL, according to Berkeley Lab’s queue data file. The filing names Neoga South as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of July 11, 2027.

Queue IDS1057
Project nameSurplus; Glacier Moraine
Status (as published)Active
SubstationNeoga South
Point of interconnectionNeoga South
CountyCumberland
StateIL
VoltageNot reported
Capacity360 MW
Resource (as published)Solar+Other
Resource categoryHybrid (normalized for filtering)
Proposed online date2027-07-11
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Neoga South substation: 2 requests in the MISO queue, 2 active totaling 510 MW.

Queue IDProjectMWResourceStatus
S1052Surplus; Shelby150HybridActive

Cumberland, IL: 9 requests in the MISO queue, 4 active totaling 909.5 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityAMEREN ILLINOIS
Project typeGeneration
Queue date2024-07-15
Components (hybrid)Solar 360 MW + Other

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.