Cumberland, IL interconnection queue

4 active projects totaling 909.5 MW in the MISO queue, plus 5 with terminal status (shown grayed).

4active projects
909.5active MW
9total filed
Queue IDProjectkVMWResourceStatus
S1057 Surplus; Glacier Moraine n/r 360 Hybrid Active
J2662 Not reported 345 250 Solar Active
J1204 Not reported 345 199.3 Solar Withdrawn
J1771 Not reported 345 197.3 Solar Withdrawn
J2658 Not reported 345 150 Battery Withdrawn
J2660 Not reported 345 150 Battery Withdrawn
S1052 Surplus; Shelby 138 150 Hybrid Active
J1744 Not reported 138 149.5 Solar Active
J2453 Not reported 345 100 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.