Neoga South substation interconnection queue

2 active projects totaling 510 MW in the MISO queue.

2 MISO queue filings name Neoga South as the point of interconnection, all in Cumberland County, IL.

2active projects
510active MW
2total filed
Queue IDProjectkVMWResourceStatus
S1057 Surplus; Glacier Moraine n/r 360 Hybrid Active
S1052 Surplus; Shelby 138 150 Hybrid Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.