Surplus; Big Bend

MISO queue ID S1054

Surplus; Big Bend (S1054) was listed in the MISO interconnection queue at the end of 2025 as a 550 MW hybrid project in Cottonwood County, MN, according to Berkeley Lab’s queue data file. The filing names Lakefield Junction as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of October 30, 2027.

Queue IDS1054
Project nameSurplus; Big Bend
Status (as published)Active
SubstationLakefield Junction
Point of interconnectionLakefield Junction 345kV
CountyCottonwood
StateMN
Voltage345 kV
Capacity550 MW
Resource (as published)Wind+Other
Resource categoryHybrid (normalized for filtering)
Proposed online date2027-10-30
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Lakefield Junction substation: 2 requests in the MISO queue, 2 active totaling 750 MW.

Queue IDProjectMWResourceStatus
S1013Surplus; Three Waters Wind200HybridActive

Cottonwood, MN: 27 requests in the MISO queue, 7 active totaling 1,042 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityNORTHERN STATES POWER COMPANY
Project typeGeneration
Queue date2024-07-19
Components (hybrid)Wind 550 MW + Other

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first