Substation Scout

Surplus; Three Waters Wind

MISO queue ID S1013

Surplus; Three Waters Wind (S1013) was listed in the MISO interconnection queue at the end of 2025 as a 200 MW hybrid project, according to Berkeley Lab’s queue data file. The filing names Lakefield Junction as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of June 30, 2026.

Queue IDS1013
Project nameSurplus; Three Waters Wind
Status (as published)Active
SubstationLakefield Junction
Point of interconnectionLakefield Junction 345kV
CountyNot reported
StateNot reported
Voltage345 kV
Capacity200 MW
Resource (as published)Wind+Other
Resource categoryHybrid (normalized for filtering)
Proposed online date2026-06-30
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Lakefield Junction substation: 2 requests in the MISO queue, 2 active totaling 750 MW.

Queue IDProjectMWResourceStatus
S1054Surplus; Big Bend550HybridActive

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityITC MIDWEST
Project typeGeneration
Queue date2022-01-26
Components (hybrid)Wind 200 MW + Other

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.