Substation Scout

Cottonwood, MN interconnection queue

7 active projects totaling 1,042 MW in the MISO queue, plus 20 with terminal status (shown grayed).

7active projects
1,042active MW
27total filed
Queue IDProjectkVMWResourceStatus
J1315 Not reported 345 600 Wind Withdrawn
S1054 Surplus; Big Bend 345 550 Hybrid Active
J1349 Not reported 345 335 Hybrid Withdrawn
J3125 Not reported 345 289 Wind Withdrawn
J742 Not reported n/r 211 Wind Withdrawn
J2332 Not reported 345 200 Wind Active
J2563 Not reported n/r 200 Wind Active
J726 Not reported 345 200 Wind Withdrawn
H018 Not reported 161 150 Wind Withdrawn
J965 Not reported 345 150 Wind Withdrawn
G517 Not reported 69 130 Wind Withdrawn
J1036 Not reported 345 130 Solar Withdrawn
H017 Not reported 345 100 Wind Withdrawn
G759 Not reported 69 84.8 Wind Withdrawn
J3217 Not reported 345 60 Solar Withdrawn
G442 Not reported 69 50 Wind Operational
G769 Not reported 161 50 Wind Withdrawn
H045 Not reported 69 50 Wind Withdrawn
G375 Not reported 69 20 Wind Operational
G488 Not reported n/r 20 Wind Withdrawn
G532 Not reported 69 20 Wind Operational
G684 Not reported 69 20 Wind Withdrawn
J283 Not reported 69 20 Wind Withdrawn
J033 Not reported 69 4.9 Wind Withdrawn
J058 Not reported 69 4.9 Wind Withdrawn
G341 Not reported n/r 2 Gas Operational
J916 Not reported 69 2 Other Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.