Substation Scout

Surplus; J442

MISO queue ID S1047

Surplus; J442 (S1047) was listed in the MISO interconnection queue at the end of 2025 as a 120 MW hybrid project in Codington County, SD, according to Berkeley Lab’s queue data file. The filing names Big Stone South as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of November 1, 2026.

Queue IDS1047
Project nameSurplus; J442
Status (as published)Active
SubstationBig Stone South
Point of interconnectionBig Stone South 230kV
CountyCodington
StateSD
Voltage230 kV
Capacity120 MW
Resource (as published)Other+Battery
Resource categoryHybrid (normalized for filtering)
Proposed online date2026-11-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Big Stone South substation: 3 requests in the MISO queue, 2 active totaling 240 MW.

Queue IDProjectMWResourceStatus
S1046Surplus; G736120HybridActive
J4136Not reported250BatteryWithdrawn

Codington, SD: 11 requests in the MISO queue, 5 active totaling 740 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityOTTER TAIL POWER COMPANY
Project typeGeneration
Queue date2023-10-13
Components (hybrid)Other 120 MW + Battery

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.