Big Stone South substation interconnection queue

2 active projects totaling 240 MW in the MISO queue, plus 1 with terminal status (shown grayed).

3 MISO queue filings name Big Stone South as the point of interconnection, all in SD.

2active projects
240active MW
3total filed
Queue IDProjectkVMWResourceStatus
J4136 Not reported 345 250 Battery Withdrawn
S1046 Surplus; G736 230 120 Hybrid Active
S1047 Surplus; J442 230 120 Hybrid Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.