Codington, SD interconnection queue
5 active projects totaling 740 MW in the MISO queue, plus 6 with terminal status (shown grayed).
5active projects
740active MW
11total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| J773 | Not reported | n/r | 400 | Wind | Withdrawn |
| J133 | Not reported | 230 | 200 | Wind | Withdrawn |
| J721 | Not reported | n/r | 200 | Wind | Withdrawn |
| J722 | Not reported | 230 | 200 | Wind | Active |
| J774 | Not reported | n/r | 200 | Wind | Withdrawn |
| J775 | Not reported | n/r | 200 | Wind | Withdrawn |
| J436 | Not reported | 345 | 150 | Wind | Operational |
| J437 | Not reported | 345 | 150 | Wind | Operational |
| S1046 | Surplus; G736 | 230 | 120 | Hybrid | Active |
| S1047 | Surplus; J442 | 230 | 120 | Hybrid | Active |
| J719 | Not reported | n/r | 100 | Wind | Withdrawn |