Surplus; J717 (S1031) was listed in the MISO interconnection queue at the end of 2025 as a 90 MW hybrid project in Isabella County, MI, according to Berkeley Lab’s queue data file. The filing names Salt River Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of July 30, 2025.

Queue IDS1031
Project nameSurplus; J717
Status (as published)Active
SubstationSalt River Substation
Point of interconnectionSalt River Substation 138kV
CountyIsabella
StateMI
Voltage138 kV
Capacity90 MW
Resource (as published)Solar+Other
Resource categoryHybrid (normalized for filtering)
Proposed online date2025-07-30
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Salt River Substation substation: 2 requests in the MISO queue, 2 active totaling 180 MW.

Queue IDProjectMWResourceStatus
S1032Surplus; J72890HybridActive

Isabella, MI: 9 requests in the MISO queue, 6 active totaling 1,044.2 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityMETC
Project typeGeneration
Queue date2022-08-19
Components (hybrid)Solar 90 MW + Other

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.