Isabella, MI interconnection queue

6 active projects totaling 1,044.2 MW in the MISO queue, plus 3 with terminal status (shown grayed).

6active projects
1,044.2active MW
9total filed
Queue IDProjectkVMWResourceStatus
J4066 Not reported 69 250 Solar Active
J3940 Not reported 138 214 Solar Active
J717 Not reported 138 200.1 Wind Operational
J728 Not reported 138 200.1 Wind Operational
J1667 Not reported 138 200 Wind Withdrawn
J1536 Not reported 138 150 Wind Withdrawn
S1031 Surplus; J717 138 90 Hybrid Active
S1032 Surplus; J728 138 90 Hybrid Active
J1211 Not reported 138 50 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first