Salt River Substation substation interconnection queue

2 active projects totaling 180 MW in the MISO queue.

2 MISO queue filings name Salt River Substation as the point of interconnection, all in Isabella County, MI.

2active projects
180active MW
2total filed
Queue IDProjectkVMWResourceStatus
S1031 Surplus; J717 138 90 Hybrid Active
S1032 Surplus; J728 138 90 Hybrid Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.