Hoot Lake substation interconnection queue
1 active project totaling 49.9 MW in the MISO queue, plus 1 with terminal status (shown grayed).
2 MISO queue filings name Hoot Lake as the point of interconnection, all in Otter Tail County, MN.
1active projects
49.9active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| R1006 | Replace 350 MW of ALTW.FPL_DAEC Unit with Solar; Duane Arnold | 115 | 350 | Hybrid | Withdrawn |
| R1001 | Replace Hoot Lake units 2 and 3 (144.8 MW) with Seventeen (17) Sungrow 3 MW solar inverters and PV panels at 49.9 MW; Hoot Lake 2 & 3 | 115 | 49.9 | Hybrid | Active |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.