Substation Scout

MISO request J956

MISO queue ID J956

Queue request J956 was listed in the MISO interconnection queue at the end of 2025 as a 200 MW solar project in Ralls County, MO, according to Berkeley Lab’s queue data file. The filing names Spencer Creek Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of June 1, 2024.

Queue IDJ956
Project nameNot reported
Status (as published)Active
SubstationSpencer Creek Substation
Point of interconnectionSpencer Creek 345kV Substation
CountyRalls
StateMO
Voltage345 kV
Capacity200 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2024-06-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Spencer Creek Substation substation: 6 requests in the MISO queue, 2 active totaling 600 MW.

Queue IDProjectMWResourceStatus
J1026Not reported400WindActive
J1222Not reported200SolarWithdrawn
J1123Not reported150WindWithdrawn
J1240Not reported135SolarWithdrawn
J658Not reported100.1WindWithdrawn

Ralls, MO: 5 requests in the MISO queue, 2 active totaling 375 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityAmeren Missouri
ClusterDPP-2018-APR Central
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)Study Phase: GIA; Post GIA Status: Not Started
Queue date2018-03-09
Interconnection agreement date2021-12-22
Operational date2024-12-19

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.