Ralls, MO interconnection queue
2 active projects totaling 375 MW in the MISO queue, plus 3 with terminal status (shown grayed).
2active projects
375active MW
5total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| J1489 | Not reported | 345 | 500 | Other | Withdrawn |
| J1222 | Not reported | 345 | 200 | Solar | Withdrawn |
| J3720 | Not reported | 161 | 200 | Solar | Withdrawn |
| J956 | Not reported | 345 | 200 | Solar | Active |
| J2288 | Not reported | n/r | 175 | Solar | Active |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.