Substation Scout

Spencer Creek Substation substation interconnection queue

2 active projects totaling 600 MW in the MISO queue, plus 4 with terminal status (shown grayed).

6 MISO queue filings name Spencer Creek Substation as the point of interconnection, all in MO.

2active projects
600active MW
6total filed
Queue IDProjectkVMWResourceStatus
J1026 Not reported 345 400 Wind Active
J1222 Not reported 345 200 Solar Withdrawn
J956 Not reported 345 200 Solar Active
J1123 Not reported 345 150 Wind Withdrawn
J1240 Not reported 345 135 Solar Withdrawn
J658 Not reported 345 100.1 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.